Here, Grace Ball, Projects Supervisor UK&I at industrial assembly solutions manufacturer Desoutter Tools and Phil Coleman, Business Development Manager at bespoke automation system specialist adi Lean Manufacturing & Design, examine why successful commissioning starts long before installation.
The success of commissioning is rarely determined during commissioning itself. By the time an automation system reaches site, many of the factors that will influence deployment speed, production ramp-up and long-term reliability have already been established.
As automation systems become more complex, successful commissioning increasingly depends on the quality of the pre-work carried out during project scoping, stakeholder coordination and system design, rather than activities carried out during final testing.
“Customers aren’t just looking for a system that works,” explains Coleman. “They’re looking for a solution that can be integrated, commissioned and brought into production with minimal disruption, supporting smoother ramp-up. For us, this means successful commissioning starts well before equipment reaches site.”

Laying the groundwork
Modern automation projects combine robotics, vision systems, intelligent tooling, control platforms and software from multiple vendors, introducing additional interfaces that must be managed and validated from the initial RFQ and system design stages through to Factory Acceptance Testing (FAT).
“The more suppliers, technologies and stakeholders involved in a project, the greater the need for communication and coordination,” says Coleman. “Project success depends on everyone working towards the same objective, from defining the scope and selecting the right technologies.”
Preparation is therefore one of the most important factors in commissioning success. Subsystem selection, validation, FAT, collaborative planning and early integration testing help to identify issues before equipment reaches site, while practical factors such as site readiness, available utilities and competing contractors can also influence deployment timelines. Every issue identified during FAT rather than on the customer site helps reduce the risk of costly production downtime and keeps deployment schedules on track.
“Customers may have established standard operating procedures (SOPs), but when you get to the people actually using the equipment, they may have developed their own ways of working or individual operator variations,” explains Coleman. “Understanding those processes early helps prevent unexpected issues during commissioning.”

Removing risk
Software integration is often the focus of commissioning discussions, particularly as systems become more connected, but the mechanical design, quality of the build and assembly processes of the system remain equally important. Even the most advanced software and control architecture cannot compensate for inconsistent assembly processes or avoidable variation within the equipment itself.
“You can have the best software in the world, but if the machine has been badly designed or poorly built, those issues will still appear during commissioning,” says Coleman. “The objective is to remove as much uncertainty as possible before the system reaches site.”
This collaborative approach surfaces risks earlier in design, assembly and validation, giving manufacturers confidence before the system progresses through integration and deployment.
Improving consistency
As automation systems become more complex, manufacturers are increasingly looking for technologies that help control process variability, improve traceability and ensure critical assembly operations are completed as intended. The focus is moving beyond productivity alone, with manufacturers seeking greater repeatability, process adherence and digital records of critical operations.
“Many manufacturers are operating with increasingly unskilled and flexible workforces while also introducing more complex products and production processes,” says Ball. “In this environment, relying solely on tribal knowledge becomes an impossible approach. Digital process control helps ensure critical information is embedded within the process itself.”
Technologies such as Desoutter’s Pivotware process control system help manufacturers embed quality checks into assembly workflows. By guiding operators through the correct sequence and providing visibility into completed operations, these solutions help reduce variation and improve repeatability. The need to adapt without losing consistency is most visible when subtle differences between products require different assembly processes. Without clear process controls, those distinctions may not be immediately apparent to operators.
“We’ve worked with manufacturers where visually identical products require different assembly processes. Without built-in process control, it’s very easy for mistakes to occur,” says Ball. “By using solutions such as Pivotware to identify the product and present the correct workflow, manufacturers can reduce reliance on operator memory while improving first-time quality and process consistency.”
The same principle applies on the human side of the process. “The human being is the most variable thing that we deal with,” adds Coleman. “By getting the process right, you can help ensure that whoever is carrying out the task follows the correct sequence and reduce inconsistencies.”

Proving system readiness
“Commissioning should become less about troubleshooting and more about validation,” concludes Coleman. “If everyone involved has worked together from the outset, managed risk effectively and maintained high standards throughout design, assembly and integration, commissioning becomes the final confirmation that the system is ready for production.”
“Commissioning confidence starts long before the system arrives,” adds Ball. “If the right process has been built in from day one, commissioning isn’t a leap of faith, it’s just confirming what you already know to be true.”
If commissioning becomes a validation exercise rather than troubleshooting, manufacturers can deploy automation with greater certainty and fewer unexpected delays. Achieving that depends on reducing variability at source through robust project management, process control and traceability long before equipment reaches site.